Cut tube to length. Drill 35 7/8 holes in type per side weld on the I beams. Weld on backing plates for lifting lugs. Weld on lifting lugs. Weld on numbers and classification on rack. Roto blast and paint rack. Install shackles chain and bull ring per classification.